Iron Horse Bridge Railing Infill
This unique bicycle and pedestrian bridge, which spans an eight lane highway, is part of a popular foot and bicycle path in the San Francisco East Bay area.
TriPyramid worked with the bridge structural engineer to design the railing infill system. TriPyramid’s A22-0250 medium strength rods were used with custom end fittings, designed specifically for this installation, to create a chic and cost-effective solution.
Location:
us-west
Completed:
2010
Architect:
Donald MacDonald Architects
Engineer:
Arup
Customer:



